Generous concrete arch solution crossing the 200 m deep Tamina Canyon with a main span of 265 m. Total length 400 m.

Owner / Client
Kanton St. Gallen

Contractor
JV Taminabrücke (Strabag AG / J. Erni AG / Meisterbau AG)

Services by LAP
1st prize in a design competition, tender design, detailed design and construction engineering, site supervision

(c) Tiefbauamt Kanton St. Gallen