Lockwitzvalley Bridge as part of BAB A 17

Steel composite bridge with incrementally launched steel trough, 9-span continuous girder End span with constant structural depth, main spans supported by half arches Total length 723 m, main span 125 m 

Client
Bundesrepublik Deutschland, represented by order of Free State of Saxony 

Services by LAP
Design and tender documents, detailed design

Awards

  • 2008 IStructE Award for Transportation Structures

 

 

Foto: DEGES Berlin