Railway Bridge across the Danube at Deggendorf 

Steel truss railway bridge. Total length 466 m, main span 106 m. Installation of the steel superstructure by shifting across the Danube 

Owner
DB Netz AG Süd 

Contractor
Joint venture Max Streicher, Deggendorf, DSD Brückenbau, Saarlouis 

Services by LAP
Building permission application, execution drawings of steel superstructure