Main River Bridge Nantenbach 

The double-track railway bridge, curved in plan with a radius of 2 650 m on a grade of 12,59 &, connects two new high speed railway lines. The 317 m long concrete approach bridge is built by incremental launching. The river crossing is a doubly composite steel truss with a concrete top slab and a concrete bottom flange, main span 208 m and side spans 82,8 m. Tender design and bid documents with Emch + Berger, Karlsruhe, for the Railway Directorate Nürnberg.

  • 1994 Ingenieurbau-Preis und Stahl-Innovationspreis1994 Ingenieurbau-Preis Verlag Ernst & Sohn 
  • 1994 Stahl-Innovationspreis Stahl-Informations-Zentrum Düsseldorf