Rehabilitation of the 1128 m long prestressed concrete bridge with a single cell box girder with air struts, two side spans of 81 m and seven inner spans of 138 m. The height above the valley is up to 185 m.

Owner:
Bundesrepublik Deutschland

Client:
Regierungspräsidium Stuttgart

Contractor:
Leonhard Weiss GmbH & Co. KG

Services by LAP:
Basic and tender design, detailed design and site supervision

Awards:
Deutscher Brückenbaupreis 2016 (German Bridge Design Award) Category Road and Railway Bridges
Auszeichnung Deutscher Ingenieurbaupreis 2016
Ulrich-Finsterwalder Ingenieurbaupreis 2017