Wesel Bridge across River Rhine

Cable-stayed bridge with a steel main span of 334 m. Prestressed concrete box section for approach bridges. Total length 773 m

Client
Straßen NRW, Niederlassung Wesel

Contractor
Joint venture Hermann Kirchner, Hoch- und Ingenieurbau GmbH, Bad Hersfeld/Donges SteelTec GmbH, Darmstadt

Services by LAP
Specific proposal, tender design, detailed design, construction engineering

Foto (1) (2): Fotostudio B