Tunnel Dusslingen, Germany

Tunnel with a total length of 482 m, built by open cut. The project includes trough structures, retaining walls, operation buildings, railroad bridge and two pedestrian bridges as well as adjacent noise protection measures.

Owner
Federal Republic of Germany 

Client 
Regierungspräsidium Tübingen 

Contractor 
Leonhard Weiss

Services by LAP 
Preliminary design, tender design, tender documents, checking of design,

Fotos: Bastian Kratzke