Tunnel Mainzer Ring, Germany

Parts of federal highway A60 Mainz - Hechtsheim have to be lowered by a 420 m long tunnel constructed by the cut and cover method. The project also includes a ramp tunnel, retaining walls, noise protection walls, temporary bridges as well as two permanent bridges.

Client
STRABAG AG Berlin

Services by LAP
Detailed design and construction engineering


Foto: Ed. Züblin AG