SWR - New Radio Station in Stuttgart

In order to secure the excavation depth of 7,5 to 16,5 meters, a temporary pit supporting system as overlapping drilled pile walls and an inserted girder supporting system was used. Earth thrusts are lead from drilled pile walls to ceiling disks of the building. There, it was necessary to connect the floor plate with blasted holes to the drilled piles, which function as tension piles.

Owner
SWR – Südwestrundfunk, Stuttgart

Architect
Struhk Architekten Planungsgesellschaft mbH, 38100 Braunschweig

Services by LAP
Structural Design