2022
Leonhardt-Andrä-Study Prize awarded for the first time
50th Anniversary of the Olympic Park in Munich
Foundation of Leonhardt, Andrä und Partner S.L. in Madrid
2020
LAP participates in the research project BrAssMan
Groundbreaking ceremony for the New Elbe Bridges in Magdeburg
Opening of the new Württemberg State Library
Württemberg State Library awarded with Hugo Häring Mention
Opening of the New Railway Bridge Kattwyk in Hamburg
2019
Teaching Assignment for Henning Uphoff at the Hochschule Ruhr West
15th Anniversary Office Nuremberg
Development of a reinforcement made of fiber composite meterials
Foundation of Leonhardt, Andrä und Partner Praha s.r.o.
2017
Teaching Assignment for Tobias Mansperger at the Technical University of Dresden
Investigations on the Strengthening of steel bridges with high performance concrete
2016
Establishment of the Leonhardt, Andrä und Partner Holding AG
Members of LAP visit the construction site of the Forth Replacement Crossing in Scotland
New Branch Office in Taipei / Taiwan
25th Anniversary of Office Dresden and Office berlin
New Branch Office in Magdeburg
Queensferry Crossing listed in Guiness World Records as "longest pair of free-standing balanced cantilevers"
Ralf Bother awarded with German Bridge Design Award for the rehabilitation of the Kochertal Viaduct near Geislingen, Germany
2014
75th Anniversary Celebration
in the Porsche Museum Stuttgart
Establishment of the „LAP Prüf- und Sachverständigen GmbH“
10th Anniversary Office Nuremberg
New Branch Office in Frankfurt am Main
Participation in the "Integralen Generalplaner AG", Zürich
LAP supports the Deutschlandstipendium as sponsor for students of the Ruhr University Bochum
2012
LAP supports the Deutschlandstipendium as sponsor for students of the Technical University of Dresden
2011
New Branch Office in Cologne
Holger Svensson receives the Emil Mörsch Medal for special achievements in the field of concrete construction
2008
Move of Stuttgart Head Office into Nordtor Plaza
New Branch Office in Hamburg
Start of the structural design for the internatinal accelerator facility FAIR, one of the largest research projects worldwide, being built near Darmstadt, Germany
2003
Holger Svensson was elected vice-president of the IABSE
Reiner Saul receives an honorary doctorate from the Technical University of Braunschweig
2000
10th Anniversary Office Dresden and Office Berlin
Set-up of Taiwan Branch Office and support of the new Taiwan High-Speed Railway bridges
1999
Reopening of the German Reichstag Building in Berlin
Award of the 1st Fritz Leonhardt Prize to Michel Virlogeux
1996
Design of the new highway bridges across the Lockwitz and the Seidewitz Valley as part of A17 - the first of numerous highway bridges in the German reunified Eastern States
1994
New Branch Office in Erfurt
Teaching Assignment for steel bridges for Reiner Saul at the University of Stuttgart
Teaching Assignment for Wilhelm Zellner at the University of Dresden
1993
Introduction of the Quality Manual
Design of the first of meanwhile 16 bridges across river Elbe: Elbe Bridge Torgau
1991
After the Reunification, Set-up of Branch Offices in Dresden and Berlin
Numerous building projects in Berlin Mitte due to reunification
First joint company outing of all branches
Outstanding Citizen Award Medal for Fritz Leonhardt
Hans-Peter Andrä appointed as Honorary Consul of the Republic of Ruanda
1987
Start of the design tasks for the new High-Speed Rail Network of German Railways with the design of the Enzvalley Bridge
1973
First assignment for a long-span bridge in the United States: Pasco-Kennwick Cable-Stayed Bridge. Meanwhile participation in more than 25 long-span bridges in Northern America.
1957
Fritz Leonhardt Professor for Concrete Structures at the University of Stuttgart
(1967- 1969 President)
Fritz Leonhardt travels with his VW Beetle for 3 months through South America
1953
Establishment of the Partnerschip Leonhardt und Andrä
First projects in Latin America
Plans for the "Düsseldorf Bridge Family"