Excavation pit Rems-Murr-Klinik Winnenden
Due to its vicinity to neighboring property, an 11 m high excavation pit lining was necessary. In the upper part of the planned rescue car bypass, the pit lining was realized in form of a permanent nailed sprayed concrete lining. In the lower part the soil nailing was realized as temporary nailing. In order to not occupy the neighboring property, the anchorages had to be installed with a minimum of space.
Client
Rems-Murr-Kliniken gGmbH, Waiblingen
Architect
Hascher Jehle Architektur Berlin in planning association with Monnerjan Kast Walter Architekten, Düsseldorf
Services by LAP
Structural design