Main River Bridge Nantenbach, Germany
Main River Bridge Nantenbach
The double-track railway bridge, curved in plan with a radius of 2 650 m on a grade of 12,59 &, connects two new high speed railway lines. The 317 m long concrete approach bridge is built by incremental launching. The river crossing is a doubly composite steel truss with a concrete top slab and a concrete bottom flange, main span 208 m and side spans 82,8 m.
Client
Deutsche BahnAG, Bundesbahndirektion Nürnberg
Services by LAP
Tender design and bid documents
Awards
1994 Ingenieurbau-Preis Verlag Ernst & Sohn
1994 Stahl-Innovationspreis Stahl-Informations-Zentrum Düsseldorf
