Tunnel Gruibingen, Germany

Tunnel Gruibingen as part of Federal Highway A 8

Noise protection tunnel as part of federal highway A8 with a total length of 540 m, built by open cut. The project includes trough structures, over- and underpasses, culverts, retaining walls, pedestrian bridge and adjacent noise protection measures. 

Client
Federal Republic of Germany
Regierungspräsidium Stuttgart

Services by LAP
Preliminary design, tender design and documents
Checking of design