Unstrutt Valley Railway Bridge, Germany
Unstrutt Valley Railway Bridge as part of the New Highspeed Railway Line Erfurt-Leipzig/Halle
Double-track box girder bridge of prestressed concrete with 45 spans and 4 arches. Piers and arches are monolithically connected to the superstructure. Total length 2.688 m, construction of superstructure with launching formwork
Client
Deutsche Bahn AG (German Railways)
Eisenbahn-Bundesamt, Außenstelle Halle
Services by LAP
Checking of the detailed design